Canal Dredging and Sand Placement at Holland Beach

Port Huron, MI — Weather permitting, the contractor will begin dredging sand from the mouth of the Black River Canal today, May 20th, 2020. 

Sand dredged from Black River Canal will be placed in Lake Huron from Holland Beach to the south on Tuesday, May 26th and Wednesday May 27th, 2020, weather permitting. Due to the work, Holland Beach will be closed. 

The contractor will be utilizing Gratiot to LaSalle, and Conger to Holland to haul sand from the mouth of the Black River Canal to Holland Beach. There will be intermittent slowed and stop and go traffic in these areas. We encourage the public to not park on these streets during this time frame.